CIDIP 2013 (Logroño): Envíos recientes
Mostrando ítems 61-80 de 163
-
CUMPLIMIENTO DEL ESTÁNDAR PASSIVHAUS MEDIANTE SIMULACIÓN EN LA FASE DE DISEÑO. APLICACIÓN EN LA REGIÓN DE MADRID.
(2013)The aim of this paper was to reduce the overall consumption of the building. Besides getting to meet Passivhaus parameters in addition to improving indoor comfort. The space heating and the cooling loads, instead, are ... -
ANÁLISIS COMPARATIVO DE CÁLCULO DE LOS SISTEMAS DE EVACUACIÓN DE AGUAS RESIDUALES EN EDIFICIOS
(2013)The CTE in their exigency DB HS-5 marks the directives of specific legislative character in the engineered design of building drainage systems, of generalist character whose analysis is the object of this article. The ... -
BARRERAS A LA FORMACIÓN: EL CASO DE LOS INGENIEROS DE EDIFICACIÓN JEFE DE OBRA EN PYMES CONSTRUCTORAS
(2013)By investing in training, construction companies can have high quality human resources, adaptable to their technological and strategic needs. In fact, companies can improve their competitiveness through the knowledge, ... -
MÉTODO CONSTRUCTIVO PARA LA EDIFICACIÓN DE UN DOMO A BASE DE PANELES (EPS), Y SU PROPUESTA COMO VIVIENDA FAMILIAR.
(2013)It describes this initiative, the complete constructive process to self-build a dome of 8m diameter and 4.5m high with prefabricated panels of Expanded Polystyrene Foam (EPS), and that this building can be used as an ... -
ANÁLISIS DEL SECTOR CONSTRUCCIÓN ESPAÑOL A PARTIR DE SUS PRINCIPALES MAGNITUDES ECONÓMICAS
(2013)Construction in Spain has been over the past two decades about 10% of the Gross Domestic Product (GDP), the main engine of the Spanish economy, but the current global economic situation with the peculiarities of the Spanish ... -
EFECTOS DEL CEMENTO Y DE LA CAL EN MUESTRAS DE MATERIALES QUE CONTIENEN FILITAS PROCEDENTES DE SE DE ESPAÑA
(2013)It has been previously found that the compacted phyllites did not display an important swelling on soaking at low stresses, as a consequence of its low specific surface and low water-retention ability. This material exhibited ... -
METODOLOGÍA PARA LA EVALUACIÓN DE LA MADUREZ DEL SISTEMA DE GESTIÓN DE LA I+D+I EN LAS ORGANIZACIONES
(2013)Several standards, like UNE 166002 i.e., provide organizations with a standard in order to formalize and implement management system for R&D, as well as others, like ISO 15.504, provide a number of levels through which it ... -
ANÁLISIS DEL GRADO DE CULTURA ORGANIZACIONAL EN GESTIÓN DE PROYECTOS. ESTUDIO DE CASO DEL SECTOR ENERGÉTICO EN COLOMBIA
(2013)In this paper we study the degree of organizational culture towards project management of a consulting firm in the energy sector in Colombia. It illustrates the evaluation of the current situation and how it generates a ... -
IMPLEMENTACIÓN DE UNA OFICINA DE GESTIÓN DE PROYECTOS. ESTUDIO DE CASO EN EL SECTOR DE EXPLOTACIÓN DE MINAS EN COLOMBIA
(2013)This communication illustrates the process of implementing a project management office of a company's mining sector in Colombia. We present the process that has been followed since the decision of the application until the ... -
¿CÓMO LOGRAR ALCANZAR UN MODELO SUSTENTABLE DE GESTIÓN DE PROYECTOS?
(2013)This article describes the models of leadership and project management, industrial applications based on best practices of Project Management. In order to align business strategies in the management of sustainable projects ... -
PROPUESTA DE UN MODELO DE MADUREZ PARA LAS ORGANIZACIONES ESPAÑOLAS DE PROYECTOS BASADA EN JUCIO DE EXPERTOS
(2013)Maturity models emerge as a means to evaluate the capabilities and competencies in organizations regarding the implementation of the Project Management best practices, so that they mark a path to achieve improvement and ... -
HERRAMIENTA PARA LA TOMA DE DECISIONES APLICADA A LOS PROYECTOS DE INSTALACIONES DE ACONDICIONAMIENTO DE AIRE EN HOSPITALES
(2013)Hospital buildings are subjected to important technical, biological and hygienic requirements in reference to the presence of contaminant elements in the air. For this reason, a certain environmental quality with an adequate ... -
METODOLOGÍA DE LAS 3MP “MANAGEMENT MATURITY MODEL & PORTFOLIO, PROGRAMME, AND PROJECT MANAGEMENT” PARA DIAGNÓSTICAR ORGANIZACIONES DE PROYECTOS
(2013)This article describes the process of Assessment (diagnosis) and implementing a management methodology and project management, to ensure that projects are completed on cost, time and outcome, seeking to increase the ... -
VALORACIÓN DE LA APLICACIÓN DEL MÉTODO DE VALOR GANADO PARA EL CONTROL DE GRANDES PROYECTOS DE GENERACIÓN ELÉCTRICA
(2013)The earned value method allows monitoring performance in schedule and costs. Its use for major projects allows us to use objective data about the beginning and end of tasks, which delivers reliable results. But the trend ... -
SISTEMA DE PLANIFICACIÓN DE PROYECTOS EN BASE A LA SINIESTRALIDAD LABORAL
(2013)The actual techniques on Project Planning allow us to determine, very accurately, the developing and the execution of our project’s activities, their duration, the necessary resources, the priorities and the existing ... -
APLICACIÓN DEL MÉTODO MONTECARLO A LA COMPARACIÓN DE OFERTAS
(2013)The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having ... -
METODOLOGÍA DE GESTIÓN ORIENTADA A LOS AGENTES DEL PROYECTO. COMPARACIÓN ENTRE LA ENTIDAD PROMOTORA Y EJECUTORA
(2013)In this paper we illustrate the application of two of the new components of the new methodology for project management, through joint implementation in a case study area in visual health of Colombia. It aims to visualize ... -
IMPLEMENTACIÓN DE LA METODOLOGÍA DE GESTIÓN DE PROYECTOS PM2. APLICACIÓN EN UN PROGRAMA DE RECUPERACIÓN DE MICROCUENCAS EN CÓRDOBA (COLOMBIA)
(2013)In this paper shows the results of the implementation of PM2 methodology presented in the documents entitled "Project Management Methodology aimed agents involved. I. Description and structure" and "Project Management ... -
DESARROLLO DE UN PLAN DE AUTOPROTECCIÓN EN UNA EMPRESA DE FABRICACIÓN, ALMACENAMIENTO Y EXPEDICIÓN DE VIDRIO LAMINADO.
(2013)In order to comply with current regulations on the prevention of occupational hazards in the industry of production, storage, and shipping of laminated glass, the Self-Protection Plan was designed. Its main objective is ... -
DE LOS PROYECTOS AL PROGRAMA EN EL ÁMBITO PÚBLICO: NUEVO MODELO DE EVALUACIÓN DEL EMPLEO EN LA COMUNIDAD DE MADRID
(2013)Regarding different programmes belonging to the public sphere, it is essential to have proper tools able to quickly provide accurate data related to impacts generated by its projects. This aspect, along with the actual use ...