Procesos de Digitalización que implican variabilidad derivada de los operadores. Una aproximación institucional.
(2020)Servitization and Industry 4.0 are considered two of the most recent trends transforming industrial companies. Servitization is mainly focused on adding value to the customer, while Industry 4.0 is frequently related to ... -
Análisis del impacto del sector de la construcción en la economía colombiana.
(2020)Construction is one of the largest economic sectors in all the world's economies, thanks to its impact on employment generation, trade in materials and the development of essential infrastructure for social development. ... -
La figura del Director de Proyectos en la gestión integral del proceso edificatorio
(2020)The growing complexity of building projects, with high quality standards, integrated passive and active construction technologies and strong cost and time constraints, is increasingly demanding that these must be resolved ... -
Estudio mecánico a colapso en grandes tuberías de abastecimiento de agua potable
(2020)The Polytechnic University of Valencia works together with EMIMET through a research agreement, whose objective is to perform the mechanical calculation of new buried pipes collapsing for the supply of drinkable water. The ... -
Diagnóstico del fallo en las tuberías de polietileno
(2020)Due to the high number of leaks in the existing potable water supply networks in an Execution Unit of a locality, the study is carried out with the objective of knowing the causes that are causing the ruptures of the ... -
Caracterización de la rugosidad absoluta del material y del Coeficiente De Hazen-Williams
(2020)The hydraulic study of water pipes both in project work, sizing and pressure analysis, as well as in the work of surveys or analysis of the pathologies or operation of existing facilities that do not provide the minimum ... -
Análisis sobre las condiciones técnicas y la tramitación administrativa de una instalación de rociadores de respuesta rápida en naves logísticas.
(2020)Logistic warehouses have a large thermal load and generally require a sprinkler installation for fire protection. One of the best solutions to avoid the obligation to use intermediate sprinklers is the use of high flow ... -
Rehabilitación de redes de drenaje mediante algoritmos de optimización y metodologías de reducción del espacio de soluciones
(2020)One of the main problems of urban drainage infrastructures is the need for their rehabilitation to adapt to the new operating conditions derived from the increase in rainfall intensities. This work uses a rehabilitation ... -
Planificación, control y seguimiento de proyectos viales utilizando el diagrama tiempo – camino, caso: “Proyecto vial Cuzco – Perú”
(2020)Road projects are becoming more efficient and dynamic, due to the way in which each stage of the project is managed and a cause of sincerer planning among all interested areas validated by expert judgment. On the other ... -
La construcción 4.0: hacia la sostenibilidad en el sector de la construcción.
(2020)Nowadays, the construction industry is undergoing a transformation thanks to digitalization and incorporation of new technologies which industrializing its processes, currently known as Construction 4.0. The application ... -
Nuevo mortero compresible para excavaciones ejecutadas con tuneladoras de escudo (TBM)
(2020)This paper describes a new compressible mortar for excavations executed using Tunnel Boring Machine (TBM). Previous studies by different researchers establish the importance of considering pre-existing deformations and ... -
Material de escayola aligerada con polímeros para uso en placas y paneles prefabricados
(2020)This paper shows the study of a new plaster material for the preparation of prefabricated buildings. As a result of the work, the grant of the patent No. 2 722 598 was achieved, by the addition of polyvinyl acetate, sodium ... -
Modelos de evaluación de Proyectos Smart City: Ciudades pequeñas y medianas
(2020)The importance and complexity of the challenges that cities face is a fact assumed by the scientific community. The great relative weight of the solutions with which urban centers face their challenges is the subject of ... -
Financiación inmobiliaria en México
(2020)Building works have traditionally been financed through bank loans of different terms, issuance of certificates on the debt market and placement of shares in the capital market, the intention of each ... -
Análisis del sector construcción jordano
(2020)The construction sector in Jordan is an important economic sector due to its contribution to GDP and employment. Regard to the GDP, it was ranked the sixth inms of the highest economic sectors contribution to GDP and ... -
La contratación pública de obras municipales. Análisis de los proyectos de alumbrado público.
(2020)The public procurement of works from the local administration includes building projects, civil works as well as repair, rehabilitation and maintenance of municipal infrastructure such as lighting, air conditioning, roads ... -
M3C: Marco de Modelado de Metabolismo Circular en proyectos de ingeniería
(2020)Engineering projects need to be conceived in a sustainable way, so as to ensure ecocompatibility between technical metabolism associated with the project and natural metabolism that exists in the ecosystems, that is, the ... -
Dirigir proyectos con equipos interculturales
(2020)A large majority of projects currently undertaken have an international character, with the participation of a wider set of stakeholders (client, contractor, banks, consultants, local partners, subcontractors, local ... -
Los criterios sociales en la contratación pública de obras de construcción
(2020)At the global level, the term sustainability is evident in the future development policy approaches of many countries, and this translates into at least a reproduction or a statement of intent in many of the normative ... -
La compilación digital de la información
(2020)As the compilation of the technical documentation of a project occurs, in its different phases, it is compiled, archived and stored for years. If there were also a digital version of it, what advantages would it have, and ...