• Login
    Search 
    •   AEIPRO
    • Proceedings from the International Congress on Project Management and Engineering
    • Search
    •   AEIPRO
    • Proceedings from the International Congress on Project Management and Engineering
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 11-20 of 473

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    UTILIZACIÓN DE KCIS EN LA DIRECCIÓN DE PROYECTOS EN EL ÁMBITO UNIVERSITARIO 

    Pastor Fernández, Andrés; Portela Núñez, José María; Otero Mateo, Manuel; Cerezo Narváez, Alberto (2017)
    ICB 4.0 defines the key indicators of competence (KCIs) as elements that apply to all three domains -projects, programs and portfolios- to determine the level of competence in each of the areas that structure the new IPMA ...
    Thumbnail

    TRIPLE HÉLICE EN LA GESTIÓN DE PROYECTOS: LA UNIVERSIDAD TECNOLÓGICA DE CHILE Y EL NODO OSORNO NATURAL BEEF (CHILE) 

    Gómez Gajardo, Francisca; Yagüe Blanco, Jose Luis (2017)
    Universities tend to contribute to processes of territorial development through R & D activity. The theory of innovation and technology transfer links that activity with processes of economic development as a dynamizing ...
    Thumbnail

    CADENA CRÍTICA: DIMENSIONAMIENTO DE LOS BUFFERS DEL PROYECTO 

    Vázquez García, Elena; Amiama Ares, Carlos; Barrasa Rioja, Martín (2017)
    Critical Chain Project Management (CCPM) is an analytical procedure of project management based on the search for those mechanisms that allow to manage the uncertainty of a project reducing its duration, with greater ...
    Thumbnail

    VENTAJAS E INCONVENIENTES DEL BIM PARA LA GESTION DE PROYECTOS DE CONSTRUCCIÓN 

    Ferrer Gisbert, Pablo S.; Fuentes Bargues, José Luis; Galarza Nácher, Jorge; Gómez de Barreda Ferraz, Carmen (2014)
    A Building Information Model (BIM) is a digital representation of physical and functional characteristics of a building that, using open standards, aims to facilitate the decisions making not only during the design and ...
    Thumbnail

    EVALUACIÓN DE RIESGOS DE CONSTRUCCIÓN EN LA INFRAESTRUCTURA DEL CONFORT TÉRMICO EN EDIFICACIONES PUBLICAS EN ZONAS SEMIDESÉRTICAS DE MÉXICO 

    Gomez Lam, Javier Adrian; De la Cruz Romero, Marco Antonio; Martínez Alcazar, Jesús Antonio (2014)
    The conditions of temperature , humidity and cleanliness suitable for comfort in air living spaces , vary strongly challenged by society, mainly due to limited resources and economic power in these semi-desert areas . As ...
    Thumbnail

    ANÁLISIS DESCRIPTIVO DE LA LICITACIÓN DE PROYECTOS DE DISEÑO Y CONSTRUCCIÓN DE VEHÍCULOS FERROVIARIOS. 

    Gallardo Forés, Javier; Fuentes Bargues, Jose Luís; González Cruz, Mª Carmen (2017)
    The design and construction of rail vehicles is a very specialized activity, in which very few companies participate globally, which means that competitors are almost always the same in the procurement procedures that are ...
    Thumbnail

    TRATAMIENTO DE LOS PROCESOS DE GESTIÓN DEL RIESGO EN ENFOQUES DE GESTIÓN DE PROYECTOS 

    Díaz de Mera Sánchez, María del Prado; González Gaya, Cristina; Morales Camprubí, Felipe; Rosales Prieto, Víctor Francisco (2014)
    Most organizations do not analyze in depth the feasibility of its management systems. They don´t have a process for managing change well-defined, not even implemented often contingency plans at risk. Risk planning and ...
    Thumbnail

    EVALUANDO LA ACTUACIÓN DE LOS LICITADORES EN CUANTO A SUS POSICIONES Y PUNTUACIONES EN LICITACIONES CON IMPORTE TIPO DE SALIDA. 

    Ballesteros-Pérez, Pablo; González-Cruz, Mª del Carmen; Fernández-Diego, Marta; Pellicer, Eugenio (2014)
    Research in Bid Tender Forecasting Models (BTFM) has been in progress since the 1950s. None of the developed models were easy-to-use tools for effective use by bidding practitioners because the advanced mathematical apparatus ...
    Thumbnail

    PRIORIZACIÓN DE PROYECTOS PARA LA TRANSFORMACIÓN EN DESTINO TURÍSTICO INTELIGENTE MEDIANTE EL PROCESO ANALÍTICO JERÁRQUICO: CASO DEL MUNICIPIO DE BENIDORM. 

    Romero Rodriguez, Celia; Aragones Beltran, Pablo; García Melón, Mónica (2017)
    UNE 178501: 2015 defines Smart Tourist Destination as "a territory accessible to everyone, which makes use of innovation and technology, guarantees sustainable tourism development in its three aspects (economic, socio-cultural ...
    Thumbnail

    LUGNASA: METODOLOGÍA DE APOYO A LA PLANIFICACIÓN ESTRATÉGICA DEL SECTOR DE LA CIENCIA Y LA INNVOVACIÓN EN GALICIA 

    Calvo González, Alexia; Marey Pérez, Manuel Francisco (2017)
    Strategic planning is becoming an essential process in managing large organizations. The implementation of this process in recent years being an innovation in the public sector, becoming a ubiquitous standard practice in ...
    • 1
    • 2
    • 3
    • 4
    • 5
    • . . .
    • 48

    DSpace software copyright © 2002-2016  AEIPRO
    Contact Us | Send Feedback
     

     

    Browse

    All of AEIPROCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CommunityBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Discover

    AuthorAmendola, Luis (13)Capuz-Rizo, Salvador F. (11)González-Cruz, Mª Carmen (11)Ballesteros-Pérez, Pablo (9)Amiama Ares, Carlos (7)Bastante-Ceca, María José (7)Depool Malave, Tibaire Angélica (7)Otero Mateo, Manuel (7)Poveda Bautista, Rocío (7)Aragonés Beltrán, Pablo (6)... View MoreSubject
    Dirección y Gestión de Proyectos (473)
    ... View MoreDate Issued2020 - 2024 (50)2010 - 2019 (340)2008 - 2009 (83)Has File(s)Yes (473)

    DSpace software copyright © 2002-2016  AEIPRO
    Contact Us | Send Feedback