• Login
    Search 
    •   AEIPRO
    • Search
    •   AEIPRO
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 473

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    GESTIÓN DEL CONOCIMIENTO Y PROYECTOS DEL GERENTE DE MANTENIMIENTO PREVENTIVO 

    Hernández Ramírez, José G.; García G., María J.; Hernández G., Gilberto J.; De Burgos Jiménez, Jeróni (2014)
    This work relates three fields of knowledge: generation and management knowledge, project management and enterprise logistics. To accomplish this, it uses the Logistic Model Based in Position (LoMoBaP), which explains the ...
    Thumbnail

    PROPUESTA METODOLÓGICA PARA LA REALIZACIÓN DE PROYECTOS EN EL SECTOR NAVAL EN EL ÁMBITO DE LA INDUSTRIA 4.0 

    Pérez Fernández, Víctor; Salguero Gómez, Jorge; Abad Fraga, Francisco; Butrón Marín, Agustín; Marcos Bárcena, Mariano (2017)
    Fourth Industrial Revolution, so-called Industry 4.0 (I4.0), has been formulated on the basis of the Factory of the Future (FoF). Shipbuilding industry is currently so far from I4.0, even though it can be treated from the ...
    Thumbnail

    ANÁLISIS DE LA ESPECIALIZACIÓN SECTORIAL MUEBLERA DE LA REGIÓN CIÉNEGA DE JALISCO, MÉXICO 

    Quintero Hernández, Luis Héctor; Martinez Gonzalez, Daniel (2014)
    This paper addresses the sector specialization of the Furniture Industry of the Ciénega region of Jalisco, México, in order to establish political action to remain in this hypercompetitive market. An analysis of the behavior ...
    Thumbnail

    FLUCTUACIONES EN EL PRECIO DE LA LECHE ¿ESTÁN PREPARADAS LAS EXPLOTACIONES LÁCTEAS GALLEGAS? 

    Escudero Roldós, Carlos; Irimia Fernández, Sonia; Álvarez López, Carlos José (2014)
    After a period of low milk prices received by producers during the second half of 2007 and early 2008 they came to perceive almost 50 euros per 100 litres of milk. This brief boom period was succeeded a five year period ...
    Thumbnail

    MODELANDO LA INTEGRACIÓN DE GESTIÓN DE PROYECTO EN GESTIÓN DE OBRAS EDIFICACIÓN. UN ENFOQUE PARA JEFES DE OBRAS Y CONSTRUCTORAS. 

    Sánchez Saiz-Ezquerra, Bruno; Flanagan, Roger; Sanz Larrea, Cristina; Latorre Úriz, Asier; Vidaurre Arbizu, Marina (2017)
    The need for tools to achieve a higher level of competitiveness and profitability has made management systems an important partner for construction companies. The environment in which building projects are carried out is ...
    Thumbnail

    IMPLANTACIÓN Y EVOLUCIÓN DEL MÉTODO DE LA CADENA CRÍTICA: UN ESTUDIO DE CASO 

    Apaolaza Pérez de Eulate, Unai; Lizarralde Aiastui, Aitor (2014)
    The Critical Chain method has been implemented in a wide variety of industries, activities and countries. This article is based on the implementation of this method in two different units of the same company which designs, ...
    Thumbnail

    METODOLOGÍA DE GESTIÓN DE PARADAS MEDIANTE CRITERIOS DE DIRECCIÓN DE PROYECTOS 

    Ortega Fernández, Francisco; Tejero Fernández, José Manuel; Luiña Fernández, Rocío; Alba, Carlos (2014)
    There are many industrial activities that requiere a cost, schedule and quality mesurement and control, but there are not usually managed in a project way. This communication describes a methodology for the industrial ...
    Thumbnail

    ESTIMACIÓN DEL MARGEN DE GESTIÓN DEL PROYECTO DE CONSTRUCCIÓN DE UN BUQUE TIPO FERRY MEDIANTE EL MÉTODO DE MONTECARLO 

    Mascaraque-Ramírez, Carlos; Para-González, Lorena; Madrid, Ana E. (2017)
    The naval sector of new buildings is characterized by high cost programs and by a low definition grade in the tender stages. With these requirements, an initial highly-competitive and acceptable risk budget should be ...
    Thumbnail

    MONITORIZACIÓN EN LA DIRECCIÓN DE EJECUCIÓN DE LA OBRA: ANÁLISIS DEL CUMPLIMIENTO DE LA LEY DE ORDENACIÓN DE LA EDIFICACIÓN 

    Benítez Oliva, Antonio; Chaza Chimeno, María Del Rosario (2017)
    This paper focuses exclusively on the site project execution manager, as defined in the Spanish Building Act (Law 38/1999 of 5 November). A methodology consisting in the identification and evaluation of ten aspects was ...
    Thumbnail

    HACIA UN NUEVO ENFOQUE EN LA GESTIÓN DE RIESGOS. LA IMPORTANCIA DEL TRATAMIENTO DE LAS CAUSAS DE RIESGO 

    Rebollar Rubio, Rubén; Lidón López, Iván; Pérez Cebrian, Alfonso (2014)
    Projects are subject to an important degree of uncertainty since its inception. This uncertainty results into risks that will have consequences in it, preventing meeting its goals. These deviations suggest that risk ...
    • 1
    • 2
    • 3
    • 4
    • . . .
    • 48

    DSpace software copyright © 2002-2016  AEIPRO
    Contact Us | Send Feedback
     

     

    Browse

    All of AEIPROCommunities & CollectionsBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Discover

    AuthorAmendola, Luis (13)Capuz-Rizo, Salvador F. (11)González-Cruz, Mª Carmen (11)Ballesteros-Pérez, Pablo (9)Amiama Ares, Carlos (7)Bastante-Ceca, María José (7)Depool Malave, Tibaire Angélica (7)Otero Mateo, Manuel (7)Poveda Bautista, Rocío (7)Aragonés Beltrán, Pablo (6)... View MoreSubject
    Dirección y Gestión de Proyectos (473)
    ... View MoreDate Issued2020 - 2024 (50)2010 - 2019 (340)2008 - 2009 (83)Has File(s)
    Yes (473)

    DSpace software copyright © 2002-2016  AEIPRO
    Contact Us | Send Feedback