• Login
    Ver ítem 
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2016 (Cartagena)
    • Ver ítem
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2016 (Cartagena)
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    ORGANIZATIONAL ALIGNMENT-BASED IMPROVEMENT OF PROJECT MANAGEMENT IN A SMALL FIRM

    Thumbnail
    Ver/
    CIDIP2016_01010.pdf (662.3Kb)
    Fecha
    2016
    Autor
    Apaolaza Perez De Eulate, Unai
    Lizarralde Aiastui, Aitor
    Metadatos
    Mostrar el registro completo del ítem
    Resumen
    This paper analyzes the change experienced by a small company that produces staircases to order, requiring both production and project management. It operates in an environment that has been in crisis since 2008; where on-time delivery is essential whereas the demand shows an unstable behaviour. Therefore, the company needed to improve its effectiveness. Considering both internal and market-based limitations, the alignment of the whole system was considered to be the best choice for enhancement. Starting with the initial situation of the company, this inquiry describes the implementation process, the initial results and conclusions, and the suggested future improvement lines. As a result, interesting findings related to the management of this kind of environments have been found.
    URI
    http://dspace.aeipro.com/xmlui/handle/123456789/751
    Colecciones
    • CIDIP 2016 (Cartagena) [210]

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias
     

     

    Listar

    Todo AEIPROComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    Acceder

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias