• Login
    Ver ítem 
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2020 (Alcoy)
    • Ver ítem
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2020 (Alcoy)
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A NEW EVM-DRIVEN AND RISK-AWARE INDEX RULE PROPOSAL FOR PROJECT SCHEDULING AND CONTROL USING WHITTLE APPROACH

    Thumbnail
    Ver/
    AT01-002_20.pdf (941.2Kb)
    Fecha
    2020
    Autor
    Taboada, Ianire
    Toledo Gandarias, Nerea
    Metadatos
    Mostrar el registro completo del ítem
    Resumen
    This paper deals with the problem of scheduling project tasks under uncertainty and with limited resources. In this context and under an EVM-driven project control, we formulate a risk-aware scheduling model as a Markov Decision Process, and then we derive a simple index rule using Whittle approach. By means of this method we obtain a metric per-task state that measures the dynamic service priority of a single task; it consists in allocating resources to the tasks with the current highest productivity of using the resource. The designed scheduling solution is evaluated in a realistic scenario. The results indicate that the proposed index rule improves project performance.
    URI
    http://dspace.aeipro.com/xmlui/handle/123456789/2866
    Colecciones
    • CIDIP 2020 (Alcoy) [175]

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias
     

     

    Listar

    Todo AEIPROComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    Acceder

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias