dc.descriptionLa gestión de riesgos es una actividad fundamental para el control de proyectos de ingeniería, Para ello se ha desarrollado una aplicación informática en la que determinadas variables o actividades, las que más incertidumbre pueden introducir, se representa su probabilidad de ocurrencia por funciones estadísticas, que tras obtener la función de densidad acumulada, es posible aplicar valores aleatorios. Estos valores resultantes son los que se emplearán para obtener la duración del proyecto o el coste total del mismo bajo determinada probabilidad. Todo ello, nos permite comprobar el riesgo que se adquiere cuando se decide concluir un proyecto en un tiempo igual o menos que el estimado, por ejemplo imponiendo un cronograma de ejecución rápida del mismo, o por ejemplo, cómo podemos concluir el proyecto con un coste inferior al planificado y bajo qué riesgo. Para ello se emplea una programación informática en Excel, con la que es posible plantear distintos escenarios.es_ES
dc.description.abstractRisk management is a fundamental activity for the control of engineering projects. For this purpose, a computer application has been developed in which certain variables or activities, which can be introduced by more uncertainty, represent their probability of occurrence by statistical functions, which after obtaining the cumulative density function, it is possible to apply random values. These resulting values are those that will be used to obtain the duration of the project or its total cost under a certain probability. All this allows us to verify the risk that is acquired when it is decided to conclude a project in a time equal to or less than the estimated one, for example by imposing a schedule for its rapid execution, or for example, how we can conclude the project with a cost less than planned and at what risk. For this, a computer programming is used in Excel, with which it is possible to propose different scenarios.es_ES
dc.language.isoeses_ES
dc.subject08-Gestión de Riesgos y Seguridades_ES
dc.titleDesarrollo de una aplicación informatica para gestion de riesgos utilizando el método de Montecarloes_ES
dc.title.alternativeDevelopment of an informatic application for risk management using the method of Montecarloes_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2020 (Alcoy) [175]
    XXIV Congreso Internacional de Dirección e Ingeniería de Proyectos (Alcoy, 2020)

Mostrar el registro sencillo del ítem