Mostrar el registro sencillo del ítem

dc.contributor.authorSánchez-Barroso Moreno, Gonzalo
dc.contributor.authorGonzález-Domínguez, Jaime
dc.contributor.authorAunión-Villa, Juan
dc.contributor.authorGarcía-Sanz-Calcedo, Justo
dc.contributor.authorLópez-Rodríguez, Fernando
dc.date.accessioned2020-09-29T17:20:07Z
dc.date.available2020-09-29T17:20:07Z
dc.date.issued2020
dc.identifier.isbn978-84-09-21128-9
dc.identifier.urihttp://dspace.aeipro.com/xmlui/handle/123456789/2523
dc.descriptionLa tecnología Building Information Modeling (BIM) permite mediante el trabajo de forma colaborativa la gestión de la construcción. BIM facilita la comunicación entre los distintos agentes que intervienen en un proyecto, desde la redacción y modelaje inicial, a la gestión durante todo el ciclo de vida del edificio. Por lo tanto, preparar el modelo energético de un edificio es muy aconsejable. El objetivo de este trabajo es analizar la viabilidad de utilizar la tecnología BIM 6D para optimizar las emisiones de CO2 derivadas de la construcción de edificios sanitarios. La metodología utilizada se centró en desarrollar un modelo energético de un centro de salud en un software comercial basado en BIM para analizar y contrastar los resultados obtenidos. El proyecto de centro de salud analizado tenía una superficie construida de 1.000 m2. Los resultados mostraron que el uso de la metodología BIM permite tomar decisiones en fase de proyecto que incrementan la sostenibilidad del edificio a lo largo de su ciclo de vida. También se detectó que el modelo 6D se suele realizar y entregar al propietario cuando finaliza un proyecto de construcción, perdiendo parte de la funcionalidad relacionada con la optimización del diseño en fase de proyectoes_ES
dc.description.abstractBuilding Information Modeling (BIM) technology enables building management by working collaboratively. BIM facilitates communication between the different agents involved in a project, from the initial drafting and modelling, to management throughout the building's life cycle. Therefore, preparing the energy model of a building is highly advisable. The aim of this work is to analyze the viability of using BIM 6D technology to optimize CO2 emissions derived from the construction of healthcare buildings. The methodology used was focused on developing an energy model of a health centre in a commercial software based on BIM to analyse and contrast the results obtained. The health centre project analysed had a built area of 1,000 m2. The results showed that the use of the BIM methodology allows decisions to be made in the project phase that increase the sustainability of the building throughout its life cycle. It was also detected that the 6D model is usually made and delivered to the owner when a construction project is finished, losing some of the functionality related to the optimization of the design in the project phasees_ES
dc.language.isoeses_ES
dc.subject05-Eficiencia Energética y Energías Renovableses_ES
dc.titleOptimización de las emisiones de CO2 derivadas de la construcción de edificios sanitarios mediante tecnología BIM 6Des_ES
dc.title.alternativeOptimisation of CO2 emissions from the construction of healthcare buildings using 6D BIM technologyes_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2020 (Alcoy) [175]
    XXIV Congreso Internacional de Dirección e Ingeniería de Proyectos (Alcoy, 2020)

Mostrar el registro sencillo del ítem