• Login
    Ver ítem 
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2018 (Madrid)
    • Ver ítem
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2018 (Madrid)
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    EVALUACIÓN DE RIESGOS EN LA LÍNEA DE PINTADO DE UNA EMPRESA DEDICADA A LA INYECCIÓN DE PLÁSTICOS

    Thumbnail
    Ver/
    AT08-015_2018.pdf (1.261Mb)
    Fecha
    2018
    Autor
    Peña Cerro, Laura
    Sancho Fernández, María
    García Fayos, Beatriz
    Arnal Arnal, José Miguel
    Metadatos
    Mostrar el registro completo del ítem
    Resumen
    Before the implementation of a new line in a plastics injection industrial plant, risks assessment of the existing painting lines has to be made to define the appropriate working conditions to ensure safety and health of workers through the process. This paper describes the new process to implement and the methodology to be followed for therisks assessment, as well as the main results achieved. Specifically, it is carried out the identification of the hazards to which workers are exposed in the painting stage. After that, the risks are assessed, and the preventive measures required to minimize the dangerousness and the impact of risks are proposed.
    URI
    http://dspace.aeipro.com/xmlui/handle/123456789/1691
    Colecciones
    • CIDIP 2018 (Madrid) [183]

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias
     

     

    Listar

    Todo AEIPROComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    Acceder

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias