Buscar
Mostrando ítems 181-190 de 446
LOS COSTES DE LA CALIDAD COMO HERRAMIENTA DE GESTIÓN EN EMPRESAS CONSTRUCTORAS
(2008)
The quality costs are a quality management tool to measure the continual improvement. The objective of a quality costs system is to find the level of quality that minimizes total quality costs; this will give the security ...
LA DIRECCIÓN DE PROYECTOS EN LA EMPRESA EXTENDIDA
(2008)
An extended enterprise could be both an enterprise based in a combination of different sites, even located at different continents, or resulting from co-operation of groups of working teams coming from different enterprises. ...
LA GESTIÓN DE LA I+D+I EN LAS UNIVERSIDADES ESPAÑOLAS
(2008)
The new role that universities possess in the innovation, was promoted from an evolution both of own universities and of the social frame in one that is inserted This way, university research turns into one of the props ...
MODELO DE CRITICIDAD OPERACIONAL EN GENERADORES DE PARQUES EOLICOS
(2008)
What set of elements does the attention of enterprise’s resources require? What priority do the activities have within the process of asset management? They are usually some of the questions formulated, and their answers ...
ESTRATEGIAS DE MERCADEO PARA LA COMERCIALIZACIÓN DE LOS PRODUCTOS ELECTRÓNICOS Y MECÁNICOS PRODUCIDOS EN LAS UNIDADES DE INVESTIGACIÓN Y DESARROLLO DE LA UNET
(2008)
Through the investigation of market, the electronic and mechanical product necessities were detected of the regional industrial sector, with the purpose of designing trade strategies that respond to the exigencies of the ...
ESTUDIO DE LOS MODELOS DE TOMA DE DECISIÓN EN LA DIRECCIÓN Y GESTIÓN DE PROYECTOS
(2008)
In the present paper an empirical study about the decision making processes in the Project Management areas in valencian SMEs is presented. The work is based on previous studies where it was concluded that:
• the decisions ...
LEADING WITH POWER IN A PROJECT BASED ORGANIZATION
(2008)
Leading with power in a project based organization is about earning legitimacy in complex organizational settings. Years of experience, including having fun and applying passion, persistence, and patience, enabled us to ...
GESTIÓN DE RIESGOS GEOTÉCNICOS PARA LOS PROYECTOS DE EDIFICACIÓN EN ESLOVAQUIA. CUESTIONARIO PARA ESTIMACIÓN CUALITATIVA DE RIESGOS
(2008)
Increasingly there is a need to optimize the cost in civil engineering projects and assume the risk properly. The resolution of not foreseen geotechnical problems in all kinds of civil engineering projects is a total expense ...
SELECCIÓN DE PROYECTOS DE SEIS SIGMA MEDIANTE EL USO DE AHP y ANP
(2008)
Six Sigma is a relatively new business strategy based upon a systematic and well structured methodology that seeks to minimize the variability present in manufacturing or service processes. This work describes a methodology ...
EL PROCESO DE LICITACIÓN ACTUAL Y SU RELACIÓN CON LA PREDICCIÓN DE BAJAS
(2008)
The focus of this paper is to provide a brief description of the casuistry of tendering in construction from Spain, and, after, link (which constitutes the main body of the article) with the still nascent science of Tender ...