Mostrar el registro sencillo del ítem

dc.contributor.authorLopez Rodriguez, Fernando
dc.contributor.authorGarcía Sanz Calcedo, Justo
dc.contributor.authorReyes Rodríguez, Antonio Manuel
dc.contributor.authorLopez Salazar, Juan Pablo
dc.contributor.authorGarcía Conde, Antonio Jesús
dc.contributor.authorRuiz Celma, Antonio
dc.date.accessioned2018-02-27T11:31:36Z
dc.date.available2018-02-27T11:31:36Z
dc.date.issued2016
dc.identifier.isbn978-84-617-4180-9
dc.identifier.urihttp://dspace.aeipro.com/xmlui/handle/123456789/901
dc.descriptionEl objeto de este estudio es establecer la situación y el grado de desarrollo alcanzado en una actuación consistente en la adjudicación de un concurso de Servicios Energéticos de forma agrupada a 4 municipios de la provincia de Badajoz. Se trata del primer contrato de servicios energéticos adjudicado en España de forma integral y agrupando varios municipios. Para ello se redactó un pliego de condiciones técnicas que comprendía la renovación del alumbrado público con criterios de eficiencia energética, la mejora de las instalaciones de baja tensión de edificios públicos, en donde se actuaba sobre las unidades terminales, sistema de distribución y equipos de producción de frio y calor, sistema de producción de ACS, ascensores, etc. Los resultados del concurso arrojaron unas inversiones cercanas a los 500.000 € en los cuatro municipios en alumbrado (exterior e interior), implementación de energías renovables y sistemas de monitorización y telegestión. El ahorro económico medio conseguido inicialmente para cada municipio era del 22,68%.es_ES
dc.description.abstractThe purpose of this study is to establish the status and degree of development reached in a consistent performance in the award of a contest Energy Services for 4 municipalities in the province of Badajoz grouped. This is the first contract awarded in Spain of Energy Services for several municipalities grouped integrally. This requires a technical specifications which included the renovation of the street lighting with energy efficiency criteria was drafted, the improvement of low voltage installations of public buildings, where they acted on the terminal units, distribution system and production equipment cold and heat, DHW system, lifts, etc. Competition results threw some investment of nearly € 500,000 in four municipalities in lighting (exterior and interior), implementation of renewable energies and monitoring and remote management systems. The average cost savings initially achieved for each of the township was 22.68%.es_ES
dc.language.isoeses_ES
dc.subjectEficiencia Energética y Energías Renovableses_ES
dc.titleSERVICIOS ENERGÉTICOS Y MANTENIMIENTO PARA GESTIÓN INTEGRAL MUNICIPAL. ACTUACIÓN EN EXTREMADURAes_ES
dc.title.alternativeENERGY SERVICES AND MAINTENANCE INTEGRAL MUNICIPAL MANAGEMENT. ACTION IN EXTREMADURAes_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2016 (Cartagena) [210]
    XX Congreso Internacional de Dirección e Ingeniería de Proyectos (Cartagena 2016)

Mostrar el registro sencillo del ítem