Mostrar el registro sencillo del ítem

dc.contributor.authorCasapino, Miguel A.
dc.contributor.authorPellicer, Eugenio
dc.contributor.authorTorres-Machí, Cristina
dc.contributor.authorBallesteros-Pérez, Pablo
dc.date.accessioned2018-02-27T10:47:55Z
dc.date.available2018-02-27T10:47:55Z
dc.date.issued2016
dc.identifier.isbn978-84-617-4180-9
dc.identifier.urihttp://dspace.aeipro.com/xmlui/handle/123456789/805
dc.descriptionEn el Perú la mayoría de las obras son ejecutadas con recursos públicos teniendo como principal promotor al gobierno. Un gran porcentaje de estas obras para ser ejecutadas pasan por un proceso de licitación pública. Durante este proceso se puede apreciar que existen muchos factores que limitan la participación de postores. Algunos de estos factores son: los requisitos que se exigen a las empresas para participar, los plazos, las características técnicas particulares, o la experiencia, entre otros. Para contextualizar la investigación se lleva a cabo una revisión y análisis de las leyes, los reglamentos, la normativa y demás documentos. Además de esto se realiza el análisis de los pliegos de licitación y una revisión del estado del arte. Como segundo paso se debe generar, estructurar y poner en marcha la encuesta; el marco teórico y conceptual permite generar las variables que serán medidas y estudiadas mediante la encuesta. El cuestionario se distribuye a una muestra de profesionales peruanos del sector de la construcción, que hayan participado en procesos de licitación, enfocado desde la perspectiva del contratista. El análisis de los datos y la discusión de los resultados permiten elaborar propuestas que mejoren el proceso de licitación pública en Perú.es_ES
dc.description.abstractIn Peru, most of the projects are carried out using public funds, being the Government the main developer. A high percentage of these projects go through a public procurement process in order to be built. During this process, it can be realized that there are many factors limiting the involvement of bidders. Some of these factors are: requirements demanded by the agency to companies to participate, deadlines, specific technical features, or minimum required experience, among others. To put this research into context, laws, rules, standards and other documents are reviewed. Furthermore, an analysis of specifications, as well as a literature review, are carried out. As a second step, the survey has to be developed, structured and started; the theoretical and contextual framework allows the generation of variables that are to be measured and studied by means of the survey. The questionnaire is handed out to a sample of Peruvian professionals in the construction industry who have participated in procurement processes from the point of view of the contractor. Data analysis and discussion of results lead to proposals that improve public procurement processes in Peru.es_ES
dc.language.isoeses_ES
dc.subjectIngeniería Civil, Urbanismo y Ordenación del Territorio. Construcción y Arquitecturaes_ES
dc.titleANÁLISIS DE LOS PROCESOS DE LICITACIÓN PÚBLICA DEL SECTOR DE LA CONSTRUCCIÓN EN EL PERÚes_ES
dc.title.alternativeANALYSIS OF PUBLIC PROCUREMENT PROCESSES IN THE PERUVIAN CONSTRUCTION INDUSTRYes_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2016 (Cartagena) [210]
    XX Congreso Internacional de Dirección e Ingeniería de Proyectos (Cartagena 2016)

Mostrar el registro sencillo del ítem