Mostrar el registro sencillo del ítem
DEFINICIÓN DE UNA HERRAMIENTA MULTIDIMENSIONAL PARA PLANIFICACIÓN DE PROYECTOS DE CONSTRUCCIÓN.
dc.contributor.author | Santos Fonseca, Salazar | |
dc.contributor.author | Pellicer, Eugenio | |
dc.contributor.author | Alarcón, Luis Fernando | |
dc.date.accessioned | 2018-02-27T10:45:22Z | |
dc.date.available | 2018-02-27T10:45:22Z | |
dc.date.issued | 2016 | |
dc.identifier.isbn | 978-84-617-4180-9 | |
dc.identifier.uri | http://dspace.aeipro.com/xmlui/handle/123456789/789 | |
dc.description | El objetivo del trabajo es presentar una herramienta para la programación de actividades para la ejecución de proyectos constructivos basada en la ocupación del espacio y disponibilidad de recursos. La herramienta fue desarrollada para facilitar una manera novedosa de visualizar la planificación y el seguimiento de la ejecución de actividades en un proyecto constructivo, además de facilitar el manejo de una estructura de trabajo con centenas de filas. Se estableció que la relación entre actividades, predecesoras y sucesoras, sea apenas como de fin-comienzo, sin la posibilidad de restar o sumar días, para asegurar que el proceso de ejecución se programe en la secuencia correcta. Como resultado se ha obtenido una herramienta que facilita la cómoda visualización de un gran volumen de actividades en cuatro dimensiones de la planificación: la secuencia de actividades en cada zona de la obra; el flujo de trabajo a lo largo de las distintas zonas de la obra; la identificación de inactividad para su justificación u optimización; la clara visualización del proceso constructivo a través de una matriz formada por actividades y zonas de control. La herramienta incorpora la posibilidad de exportación a MS Project para una visualización convencional en barras de Gantt. | es_ES |
dc.description.abstract | The aim of this paper is to show a tool of planning activities for the execution of building projects based on the occupation of physical space and resource availability. The tool was developed to prove a new view of the planning and the execution control in the building projects, besides to ease the handling of a work breakdown structure with hundreds of rows. It was established that the relation between activities, predecessor and successor, is only finish to start, without the possibility to plus or subtract days, to ensure that the execution process is programmed in the correct sequence. As a result, it was obtained a tool that makes easier the view in four planning dimensions of a lot of activities: The activities sequence in each site zone; the workflow throughout the distinct areas of work; the identification of inactivity, in order to justify and optimize them; the easier view of the building process through a matrix of areas and control activities. The tool includes the ability to export to MS Project for a conventional display Gantt bars. | es_ES |
dc.language.iso | es | es_ES |
dc.subject | Ingeniería Civil, Urbanismo y Ordenación del Territorio. Construcción y Arquitectura | es_ES |
dc.title | DEFINICIÓN DE UNA HERRAMIENTA MULTIDIMENSIONAL PARA PLANIFICACIÓN DE PROYECTOS DE CONSTRUCCIÓN. | es_ES |
dc.title.alternative | DEFINITION OF A MULTIDIMENSIONAL TOOL FOR PLANNING PROJECTS IN CONSTRUCTION. | es_ES |
dc.type | Article | es_ES |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
CIDIP 2016 (Cartagena) [210]
XX Congreso Internacional de Dirección e Ingeniería de Proyectos (Cartagena 2016)