SOBRE LA PROGRAMACIÓN DE PROYECTOS USANDO MED
dc.contributor.author | Gálvez, Edelmira D. | |
dc.contributor.author | Cisternas, Luis A. | |
dc.contributor.author | Ordieres Meré, Joaquín | |
dc.contributor.author | Capuz-Rizo, Salvador F. | |
dc.date.accessioned | 2018-02-27T10:44:22Z | |
dc.date.available | 2018-02-27T10:44:22Z | |
dc.date.issued | 2016 | |
dc.identifier.isbn | 978-84-617-4180-9 | |
dc.identifier.uri | http://dspace.aeipro.com/xmlui/handle/123456789/780 | |
dc.description | Desde la introducción de la matriz de estructura dependiente (MED) para programar proyectos ha habido un aumento del interés por su aplicación incluyendo aplicaciones en la industria de la construcción y la incorporación de la incertidumbre en sus variables. Sin embargo, las ecuaciones desarrolladas sólo incluyen la estimación del comienzo y terminación más temprana en proyectos sin y con solape natural. Además la dependencia considerada entre las actividades ha sido del tipo fin-inicio. El objetivo del trabajo es ampliar el uso de la MED en la programación de proyectos. Para lograr esa meta, en este trabajo se presentan ecuaciones para determinar comienzos y finalizaciones más tempranas y tardías (y también las holguras) en proyectos sin solape, con solape natural, y con solape forzado (y por lo tanto rework). Además, se consideran diferentes tipos de dependencia entre actividades: fin-comienzo, comienzo-comienzo y fin-fin. Para ilustrar el uso de las ecuaciones se han utilizado ejemplos hipotéticos. | es_ES |
dc.description.abstract | Since the introduction of the Dependency Structure Matrix (DSM) to schedule project it has been an increased interest in its application, including applications in the construction industry and the incorporation of uncertainty in the variables. However, the developed equations include only the estimation of the earliest start and earliest finish of projects without and with natural overlap. Also, only the finish to start dependency between activities has been considered. This study aims to expand the use of DSM in project scheduling. To this end, in this paper equations to determine the early and late start/finish (and activities float) are developed. This includes projects without overlap, with natural overlap, and with forced overlap (and therefore rework). In addition, different types of dependencies between activities are considered: finish to start, start to start and finish to finish. Hypothetical examples are used to illustrate the use of equations. | es_ES |
dc.language.iso | es | es_ES |
dc.subject | Dirección y Gestión de Proyectos | es_ES |
dc.title | SOBRE LA PROGRAMACIÓN DE PROYECTOS USANDO MED | es_ES |
dc.title.alternative | ON PROJECT SCHEDULING USING DSM | es_ES |
dc.type | Article | es_ES |