Mostrar el registro sencillo del ítem

dc.contributor.authorGallardo Forés, Javier
dc.contributor.authorFuentes Bargues, Jose Luis
dc.contributor.authorGonzález Cruz, Mª Carmen
dc.date.accessioned2017-10-23T08:16:11Z
dc.date.available2017-10-23T08:16:11Z
dc.date.issued2017
dc.identifier.isbn978-84-697-6121-2
dc.identifier.urihttp://dspace.aeipro.com/xmlui/handle/123456789/465
dc.descriptionLas empresas que realizan proyectos de diseño y construcción de vehículos ferroviarios participan en procedimientos de contratación, tanto públicos como privados, en diferentes países del mundo. Esto significa que se ven afectados en cada uno de los procedimientos por prescripciones técnicas, económicas, sociales y normativas diferentes, lo que genera riesgos de diferente índole, que deben ser identificados y analizados, con objeto de disponer de mayor información para decidir la participación o no en los procedimientos de contratación. El objetivo de esta comunicación es presentar, a través de un caso de estudio, una metodología para la identificación, análisis y posterior evaluación de los riesgos que aparecen durante la fase de preparación de las ofertas de licitación para proyectos de diseño y construcción de vehículos ferroviarios. Dada la influencia de muchos factores así como la incertidumbre de los datos disponibles, la metodología se basa en la combinación de lógica difusa y una técnica de decisión multicriterio, como es el Analytic Hierarchy Process (AHP). La metodología propuesta determinará el nivel de riesgo del proyecto, aportando a la empresa información para la toma de decisiones sobre la participación en la licitación.es_ES
dc.description.abstractCompanies that carry out projects for the design and construction of rail vehicles participate in contracting procedures, both public and private, in different countries of the world. This means that they are affected in each of the procedures by different technical, economic, social and regulatory requirements, which creates different risks, which must be identified and analyzed, in order to have more information to decide the participation or not in procurement procedures. The objective of this communication is to present, through a case study, a methodology for the identification, analysis and subsequent evaluation of the risks that appear during the preparation phase of the tenders for projects of design and construction of railway vehicles. Given the influence of many factors as well as the uncertainty of the available data, the methodology is based on the combination of fuzzy logic and a multicriteria decision-making technique, such as the Analytic Hierarchy Process (AHP) The proposed methodology will determine the risk level of the project, providing the company with information to make decisions about participation in the tendering process.es_ES
dc.language.isoeses_ES
dc.subjectGestión de Riesgos y Seguridades_ES
dc.titleAPRECIACIÓN DE RIESGOS EN LA LICITACIÓN DE PROYECTOS DE DISEÑO Y CONSTRUCCIÓN DE VEHÍCULOS FERROVIARIOSes_ES
dc.title.alternativeDESCRIPTIVE ANALYSIS OF THE TENDER OF PROJECTS OF DESIGN AND CONSTRUCTION OF RAILWAY VEHICLES.es_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2017 (Cádiz) [180]
    XXI Congreso Internacional de Dirección e Ingeniería de Proyectos (Cádiz, 2017)

Mostrar el registro sencillo del ítem