• Login
    Ver ítem 
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2017 (Cádiz)
    • Ver ítem
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2017 (Cádiz)
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    IMPLANTACIÓN DE INDICADORES DE RENDIMIENTO PARA EL CONTROL DE PROYECTOS

    Thumbnail
    Ver/
    AT01-017.pdf (1.246Mb)
    Fecha
    2017
    Autor
    Montero Fernández - Vivancos, Guillermo
    Pajares Gutiérrez, Javier
    Onieva Giménez, Luis
    Metadatos
    Mostrar el registro completo del ítem
    Resumen
    Many studies consider that measuring a project's performance is a critical factor in its success. Using a "base table" of indicators a methodology was developed to implement in any kind of project. The systematics was applied to different types of projects validating the performance indicators for project management, their characterization and after identificating the specific project's indicators.
    URI
    http://dspace.aeipro.com/xmlui/handle/123456789/341
    Colecciones
    • CIDIP 2017 (Cádiz) [180]

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias
     

     

    Listar

    Todo AEIPROComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    Acceder

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias