• Login
    Ver ítem 
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2009 (Badajoz)
    • Ver ítem
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2009 (Badajoz)
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    ASPECTOS A TENER EN CUENTA EN LA IMPLANTACION DE SISTEMAS DE GESTION DEL VALOR GANADO EN LA DIRECCION DE PROYECTOS

    Thumbnail
    Ver/
    CIIP09_0360_0370.pdf (900.4Kb)
    Fecha
    2009
    Autor
    Roca, L.R.F.
    Metadatos
    Mostrar el registro completo del ítem
    Resumen
    In the implementation phase and direction of a project, do not always get the outcome that had been planned earlier. Usual appearance of the modified problems and interference in project development, shortcomings and possible improvements not previously t
    URI
    http://dspace.aeipro.com/xmlui/handle/123456789/2613
    Colecciones
    • CIDIP 2009 (Badajoz) [215]

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias
     

     

    Listar

    Todo AEIPROComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    Acceder

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias