• Login
    Ver ítem 
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2009 (Badajoz)
    • Ver ítem
    •   AEIPRO Principal
    • Proceedings from the International Congress on Project Management and Engineering
    • CIDIP 2009 (Badajoz)
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    EVALUACION DE LOS RIESGOS EN EL INCUMPLIMIENTO DE LOS PLAZOS DE LOS PROYECTOS Y POSIBILIDADES DE ANALISIS Y TRATAMIENTO

    Thumbnail
    Ver/
    CIIP09_0401_0412.pdf (859.7Kb)
    Fecha
    2009
    Autor
    García, Fernando
    Rodríguez, Fernando
    Fernández, Gonzalo
    Metadatos
    Mostrar el registro completo del ítem
    Resumen
    The risks are inherent in the construction like in each human effort. Consequently, the management of risk relates to the construction, like a successful task and realization of any project of the construction. A way to manage the risks of the project eff
    URI
    http://dspace.aeipro.com/xmlui/handle/123456789/2610
    Colecciones
    • CIDIP 2009 (Badajoz) [215]

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias
     

     

    Listar

    Todo AEIPROComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    Acceder

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias