Plan de Prevención de Riesgos Laborales en un proyecto de energía solar fotovoltaica.
dc.contributor.author | Otero-Mateo, Manuel | |
dc.contributor.author | Cerezo-Narváez, Alberto | |
dc.contributor.author | Peinado-Bueno, Francisco Manuel | |
dc.contributor.author | Pastor-Fernández, Andrés | |
dc.contributor.author | García Hochenleyter, María del Carmen | |
dc.date.accessioned | 2019-10-02T11:15:09Z | |
dc.date.available | 2019-10-02T11:15:09Z | |
dc.date.issued | 2019 | |
dc.identifier.isbn | 978-84-09-13557-8 | |
dc.identifier.uri | http://dspace.aeipro.com/xmlui/handle/123456789/2351 | |
dc.description | Se estima imprescindible, en cualquier proyecto, el establecimiento, seguimiento y cumplimiento de unas especificaciones de calidad, reflejado en el Plan de Calidad del Proyecto, el cual define cómo se va a lograr cumplirlas, así como los procedimientos para llevarlos a cabo. El caso de estudio corresponde a una empresa de Ingeniería española, subcontratada para realizar los trabajos de cimentación e instalación de los seguidores solares, así como la instalación de los módulos fotovoltaicos en la zona norte de Chile, debiendo cumplir con la normativa en Prevención de Riesgos Laborales. El director del proyecto es el responsable ejecutivo de la calidad de este, responsable del departamento de producción, de la aprobación de los entregables del proyecto, entre los cuales está el Plan de prevención de riesgos laborales, por lo que la seguridad y salud en el trabajo no es un elemento ajeno a las competencias que debe desarrollar el Director del Proyecto. De esta forma, se potencia la integración de la seguridad y salud, identificando desde la fase inicial del proyecto las actividades necesarias para realizar la evaluación del desempeño del Sistema de Gestión, es posible establecer los responsables del seguimiento, medición e informe de los indicadores. | es_ES |
dc.description.abstract | It is considered essential, in any project, the establishment, monitoring and compliance with quality specifications, reflected in the Project Quality Plan, which defines how they will be achieved, as well as the procedures to carry them out. The case study corresponds to a Spanish engineering company, subcontracted to perform the work of foundation and installation of solar trackers, as well as the installation of photovoltaic modules in the northern area of Chile, and must comply with the regulations on Risk Prevention. The director of the project is the executive responsible for the quality of this, responsible for the production department, for the approval of the deliverables of the project, among which is the Occupational Risk Prevention Plan, for which the safety and health in the Work is not an element alien to the competences that the Project Director must develop. In this way, the integration of safety and health is strengthened, identifying from the initial phase of the project the activities necessary to perform the evaluation of the performance of the Management System, it is possible to establish those responsible for monitoring, measuring and reporting the indicators. | es_ES |
dc.language.iso | es | es_ES |
dc.subject | Gestión de Riesgos y Seguridad | es_ES |
dc.title | Plan de Prevención de Riesgos Laborales en un proyecto de energía solar fotovoltaica. | es_ES |
dc.title.alternative | Plan for Occupational Risks Prevention in a photovoltaic solar energy project. | es_ES |
dc.type | Article | es_ES |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
CIDIP 2019 (Málaga) [169]
XXIII Congreso Internacional de Dirección e Ingeniería de Proyectos (Málaga, 2019)