Mostrar el registro sencillo del ítem
Prevención de riesgos laborales en plantas de prefabricados de concreto con acero de refuerzo
dc.contributor.author | Jiménez Arguellez, Victor | |
dc.contributor.author | Rocha Chiu, Luis | |
dc.contributor.author | Espinosa Garza, Gerardo | |
dc.date.accessioned | 2019-10-02T11:15:03Z | |
dc.date.available | 2019-10-02T11:15:03Z | |
dc.date.issued | 2019 | |
dc.identifier.isbn | 978-84-09-13557-8 | |
dc.identifier.uri | http://dspace.aeipro.com/xmlui/handle/123456789/2350 | |
dc.description | En la Ciudad de México, se está llevando a cabo la construcción de un túnel de 62 km, para tal efecto, se están utilizando máquinas autopropulsadas para la excavación y dichas maquinas tienen la capacidad de ir colocando los elementos de concreto prefabricado que van formando el soporte primario. Para la fabricación de los elementos de concreto, se construyeron tres plantas, las cuales se pueden clasificar como centros laborales industrializados ya que cuentan con sistemas de producción mecanizada. En este sentido, los trabajadores reciben capacitación orientada de manera específica a su actividad que desarrollaran dentro de la planta, pero, estas plantas solo son de manera provisional, es decir, que solo funcionaran mientras se requiera producir los elementos de concreto que forman parte del túnel. Debido a que, el proyecto para la construcción del túnel, incluye a las tres plantas de prefabricados, lo hace parte de la inercia y formas de trabajar en el sector de la construcción, y con ello, las carencias en materia de prevención de riesgos laborales. Por tal motivo, con la presente investigación pretende analizar las condiciones bajo las cuales se labora en estos centros de trabajo y proponer medidas para la mejora de la seguridad laboral. | es_ES |
dc.description.abstract | In Mexico City, is being carried out the construction of a tunnel of 62 km, for this purpose, self-propelled machines are used for excavation and these machines have the ability to go by placing the elements of prefabricated concrete that integrate the primary support. For the manufacture of concrete elements, three plants were builded, which can be classified as industrialized labor centers due they have mechanized production systems. In this sense, the workers receive training geared specifically to their activity that develop within the plant, but these plants are only provisionally, they will only work as it is required to produce the elements of concrete forming part of the tunnel. Since the project for the construction of the tunnel, includes the three precast plants, makes it part of the inertia and ways of working in the construction sector, and thus, the deficiencies in the area of occupational risk prevention. For this reason, with this research aims to analyze the conditions under which work in these workplaces and propose measures for the improvement of safety at work. | es_ES |
dc.language.iso | es | es_ES |
dc.subject | Gestión de Riesgos y Seguridad | es_ES |
dc.title | Prevención de riesgos laborales en plantas de prefabricados de concreto con acero de refuerzo | es_ES |
dc.title.alternative | Prevention of occupational risks in precast concrete with reinforcing steel plants | es_ES |
dc.type | Article | es_ES |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
CIDIP 2019 (Málaga) [169]
XXIII Congreso Internacional de Dirección e Ingeniería de Proyectos (Málaga, 2019)