    REVISIÓN DE LOS MÉTODOS DE PROGRAMACIÓN DE PROYECTOS PARA EDIFICIOS DE ALTURA Y PROPOSICIÓN PARA APLICAR EN LA REGIÓN DE COQUIMBO, CHILE.

    Thumbnail
    Ver/
    CIIP10_0618_0629.PDF (177.9Kb)
    Fecha
    2010
    Autor
    Contreras González, Oscar
    Aragonés, Pablo
    Metadatos
    Mostrar el registro completo del ítem
    Resumen
    This document proposes a review of different methods for estimating durations of activities or tasks in the classical models of programming projects and a proposal for improvement of these estimates, using stochastic models. Is intended to apply to projects of high buildings in the Region of Coquimbo, Chile. In the introduction, a study of the techniques and latest programming methods and then, there is the modeling for the characteristics of the area described. Finally, some conclusions and suggestions from which justifies the development of the model. Keywords: project; scheduler; stochastic.
    URI
    http://dspace.aeipro.com/xmlui/handle/123456789/2202
    Colecciones
    • CIDIP 2010 (Madrid) [239]

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias
     

     

    Listar

    Todo AEIPROComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    Acceder

    DSpace software copyright © 2002-2016  AEIPRO
    Contacto | Sugerencias