Mostrar el registro sencillo del ítem
ANÁLISIS DE PROYECTOS EN ENERGÍA ELÉCTRICA: CASO DEL NORTE DE CHILE
dc.contributor.author | Morales, A | |
dc.contributor.author | Vergara, E | |
dc.date.accessioned | 2019-04-12T06:47:54Z | |
dc.date.available | 2019-04-12T06:47:54Z | |
dc.date.issued | 2008 | |
dc.identifier.isbn | 978-84-936430-3-4 | |
dc.identifier.uri | http://dspace.aeipro.com/xmlui/handle/123456789/1767 | |
dc.description | El primer productor de cobre del mundo es Chile, y los principales yacimientos con las mejores leyes de este metal, están ubicados en el desierto de Atacama, Norte Grande. En estos últimos 20 años el aumento del consumo explosivo de energía se ha expandido a una tasa anual de un 7,5% aproximadamente provocado especialmente por consumidores industriales mineros. De acuerdo a estas tasas el país ha tenido que duplicar su capacidad de suministro eléctrico en estos últimos 10 años. En esta publicación se analizan los problemas que han influido en el desarrollo de la gestión proyectos eléctricos en el Norte Grande chileno, para ello se revisa la cartera de proyectos de las dos principales generadoras del SING. Los resultados muestran que importantes proyectos de última tecnología de generación eléctrica, han fracasado producto de deficiencias detectadas en el ciclo de vida de los proyectos y su post operación. Palabras clave: Gestión de proyectos, energía eléctrica | es_ES |
dc.description.abstract | The first producer of copper of world is Chile, and the principal deposits with the best laws of this metal, they are located in the Atacama Desert, North of Chile. In latter 20 years the increase of the explosive consumption of energy has expanded to an annual rate of 7, 5 % approximately provoked specially to industrial mining consumers. In agreement to these rates the country has had to duplicate your capacity of electrical supply in latter 10 years. In this publication there are analyzed the problems that have influenced in development of management electrical projects in the Chilean North, for it there is checked the project portfolio of both generating principal ones of SING. The results show that important projects of last technology of electrical generation, they have failed product of faults detected in the cycle of life of the projects and your post operation. Keywords: Management of projects, electric power | es_ES |
dc.language.iso | es | es_ES |
dc.subject | Dirección y Gestión de Proyectos | es_ES |
dc.title | ANÁLISIS DE PROYECTOS EN ENERGÍA ELÉCTRICA: CASO DEL NORTE DE CHILE | es_ES |
dc.title.alternative | ANÁLISIS DE PROYECTOS EN ENERGÍA ELÉCTRICA: CASO DEL NORTE DE CHILE | es_ES |
dc.type | Article | es_ES |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
CIDIP 2008 (Zaragoza) [245]
XII Congreso Internacional de Dirección e Ingeniería de Proyectos (Zaragoza, 2008)