Mostrar el registro sencillo del ítem

dc.contributor.authorRamirez Pascual, Manuel
dc.date.accessioned2018-10-17T12:55:14Z
dc.date.available2018-10-17T12:55:14Z
dc.date.issued2018
dc.identifier.isbn978-84-09-05132-8
dc.identifier.urihttp://dspace.aeipro.com/xmlui/handle/123456789/1590
dc.descriptionPara la obtención de viviendas de calidad es importante el análisis estadístico de las incidencias, que aparecen en la fase de revisión y una vez entregadas, con la finalidad de determinar mejoras en todo el proceso constructivo. La utilización de la metodología BIM permite que esta información se incluya en la base de datos. En este trabajo se realiza el estudio de las incidencias que se producen en el sistema de calefacción y agua caliente sanitaria en un total de 13.854 viviendas de protección pública durante 11años (2005 a 2015). Las decisiones del cambio se realizaron en el equipo de producto de la promotora de modo que la información de la que los proyectistas dispondrán para realizar los proyectos será la que provenga del análisis del estudio estadístico de las incidencias. Siempre utilizando la metodología BIM. Los resultados del cambio planteados han sido positivos al reducirse el número de incidencias por vivienda en la fase tras escrituración. Así mismo tras el análisis en fase de revisión de viviendas antes de su entrega y en fase tras escrituración, se propone como mejora la realización de una prueba de servicio poco antes de la entrega de la vivienda.es_ES
dc.description.abstractIn order to obtain quality housing, the statistical analysis of the incidents, which appear in the revision phase and once delivered, is important in order to determine improvements in the entire construction process. The use of the BIM methodology allows this information to be included in the database. In this work, the study of the incidences that occur in the heating and hot water system in a total of 13,854 housings of public protection during 11años (2005 to 2015) is carried out. The decisions of the change were made in the product team of the promoter so that the information which the designers will have to carry out the projects, will be the one that comes from the analysis of the statistical study of the incidents. Always using the BIM methodology. The results of the change raised have been positive since the number of incidences per house, in the phase after deed have been reduced. Likewise after the analysis in phase of review of houses before its delivery and in phase after writing, it is proposed as improvement the execution of a test of service shortly before the delivery of the house.es_ES
dc.language.isoeses_ES
dc.subjectIngeniería Civil, Urbanismo y Ordenación del Territorio. Construcción y Arquitecturaes_ES
dc.titleESTUDIO DE INCIDENCIAS DESPUÉS DEL CAMBIO DE CALDERA INDIVIDUAL A CALDERA CENTRALIZADA.es_ES
dc.title.alternativeSTUDY OF INCIDENTS AFTER THE CHANGE OF INDIVIDUAL BOILER TO CENTRALIZED BOILER.es_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2018 (Madrid) [183]
    XXII Congreso Internacional de Dirección e Ingeniería de Proyectos (Madrid, 2018)

Mostrar el registro sencillo del ítem