METODOLOGÍA DEL PROYECTO EN ARQUITECTURA INDUSTRIAL SOSTENIBLE
Fecha
2013Autor
LOSADA RODRIGUEZ, RAMÓN
ROJÍ CHANDRO, EDUARDO
ORBE MATEO, AIMAR
CUADRADO ROJO, JESÚS
Metadatos
Mostrar el registro completo del ítemResumen
Confront the design activity and industrial building design, means taking a position regarding the inspiration and the degree or practice, two terms of scope inaccurate and misleading interpretations, but linked to professional practice of the designer.
Reference should be made to demanding industrial enterprise surroundings and how to design in the context of cost, time and quality, the way in which meets the needs of the production process and the people who care, because the cycle sustainable industrial building life. This requires consider projecting activity over time, which requires the application of different approaches and strategies in the development.
This paper presents a methodology for the development of the project activity, which requires review some conceptual and methodological issues and even personal attitude of the designer, to the spatial resolution of necessity, which is the sustainable industrial building
Colecciones
- CIDIP 2013 (Logroño) [163]