dc.descriptionLa constante exposición a las condiciones climáticas adversas que sufren los proyectos de obra civil genera en la gran mayoría de los casos muchos retrasos que son lamentablemente ineludibles para la planificación de las obras. Por tanto, la gestión del tiempo y la planificación de las actividades en una fase inicial siempre serán una ventaja considerable al momento de estimar la duración del futuro proyecto. Sin embargo y aun así, son escasas las investigaciones que abordan y cuantifican las pérdidas de productividad por efecto del clima en las obras de construcción de forma objetiva. Para hacer frente a esta problemática, un estudio de caso aplicado al país de Chile muestra la extensión en el tiempo que sufren seis proyectos de construcción de puentes similares con estructura de hormigón armado. Dicho estudio, implica de la aplicación de una metodología sencilla en base a coeficientes climáticos de reducción generados para cada una de las actividades de construcción que se ven influenciadas por el clima. Además, para una mejor interpretación de los coeficientes climáticos de reducción se presentan una serie de mapas de isocurvas que representan la pérdida de productividad promedio esperada.es_ES
dc.description.abstractConstant exposure to adverse weather conditions in civil work projects generates, in most cases, unavoidable delays during the execution phase. Therefore, activity planning and time management at an early stage will always be advisable when estimating the future project duration. However, little research addressing has been made quantifying the productivity loss due to the effect of weather in construction works. To address this problem, a case study applied in Chile shows the project duration extension suffered on a series of six similar reinforced concrete bridge construction projects. This study, involves the application of a simple method based on climate performance reduction coefficients generated for each construction activity and show how the latter are influenced by weather. In addition, for the sake of clarity a series of isocurve maps depicting the expected average productivity loss are presented.es_ES
dc.language.isoeses_ES
dc.subjectIngeniería Civil, Urbanismo y Ordenación del Territorio. Construcción y Arquitecturaes_ES
dc.titleINFLUENCIA DE LA CLIMATOLOGÍA EN LA PRODUCTIVIDAD Y DURACIÓN DE LOS PROYECTOS DE CONSTRUCCIÓN. CASO DE ESTUDIO EN CHILEes_ES
dc.title.alternativeCLIMATE INFLUENCE ON CONSTRUCTION PRODUCTIVITY AND PROJECT DURATION. CASE STUDY IN CHILEes_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2016 (Cartagena) [210]
    XX Congreso Internacional de Dirección e Ingeniería de Proyectos (Cartagena 2016)

Mostrar el registro sencillo del ítem