Mostrar el registro sencillo del ítem

dc.contributor.authorArmero Martínez, Antonio
dc.contributor.authorCapuz-Rizo, Salvador F.
dc.contributor.authorSánchez Romero, Miguel Ángel
dc.date.accessioned2017-10-23T08:13:40Z
dc.date.available2017-10-23T08:13:40Z
dc.date.issued2017
dc.identifier.isbn978-84-697-6121-2
dc.identifier.urihttp://dspace.aeipro.com/xmlui/handle/123456789/361
dc.descriptionLa electrificación de la ciudad de Valencia se inicia en 1887 con la instalación de varios generadores en la fábrica de gas del Marqués de Campo en el Llano del Remedio. A la muerte de Campo, su influencia se diluye con rapidez y el mercado se abre a otros competidores. Las mejoras en el alumbrado y la motorización determinaron un fuerte incremento de la demanda del fluido eléctrico y en consecuencia, la aparición de nuevos productores. Tras el cierre de la fábrica de Campo se proyectó en las proximidades de Valencia, el complejo hidroeléctrico de Daroqui. Esta actuación pretendía aprovechar la fuerza del agua en una heredad del mismo nombre situada en Manises junto al río Turia. El salto requería para ser aprovechado de una importante transformación donde aparte de la obra civil se había previsto otra instalación para apoyo térmico. Un antiguo molino harinero allí ubicado daba nombre a todo el conjunto que iba a ser el principal activo de la sociedad Electro Hidráulica del Turia que se fundó en 1905. El objetivo de la sociedad era suministrar energía eléctrica a la ciudad de Valencia y a los pueblos circundantes por el oeste.es_ES
dc.description.abstractThe electrification of the city of Valencia began with the installation of several generators in the Marquis of Campo’s gas factory located inside the city. That was in 1887. Upon Campo's death, his influence is quickly diluted and the market opens up to other competitors. Improvements in lighting and motorization led to a strong increase in the demand for electricity and, consequently, the appearance of new producers. After the closure of the Campo’s factory, the Daroqui hydroelectric complex was projected in the vicinity of Valencia. This action was intended to take advantage of the strength of the water in an inheritance of the same name located in Manises close to the river Turia. The project required an important transformation both in civil and electrical engineering including thermal support. An old flour mill located there gave name to the whole that was going to be the main asset of the company Electro Hidráulica del Turia that was founded in 1905. The objective of the society was to supply electrical energy to the city of Valencia and the surrounding towns.es_ES
dc.language.isoeses_ES
dc.subjectIngeniería Civil, Urbanismo y Ordenación del Territorio. Construcción y Arquitecturaes_ES
dc.titleEL PROYECTO HIDROELÉCTRICO DEL MOLINO DE DAROQUIes_ES
dc.title.alternativeTHE HYDROELECTRIC PROJECT OF DAROQUI MILLes_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2017 (Cádiz) [180]
    XXI Congreso Internacional de Dirección e Ingeniería de Proyectos (Cádiz, 2017)

Mostrar el registro sencillo del ítem