dc.contributor.authorCerezo Narváez, Alberto
dc.contributor.authorPortela Núñez, José María
dc.contributor.authorPastor Fernández, Andrés
dc.contributor.authorOtero Mateo, Manuel
dc.date.accessioned2017-10-23T08:13:38Z
dc.date.available2017-10-23T08:13:38Z
dc.date.issued2017
dc.identifier.isbn978-84-697-6121-2
dc.identifier.urihttp://dspace.aeipro.com/xmlui/handle/123456789/352
dc.descriptionEn el sector de la construcción, esta investigación trata de exponer las ventajas de utilizar el sistema estructural de descomposición del coste, como base para la realización de la estructura de desglose del trabajo -EDT-, dados los avances en normalización, armonización y unificación alcanzados por los sistemas de clasificación de costos. La EDT define con exhaustividad y organiza con jerarquía el alcance del proyecto, representando todo el trabajo especificado para lograr los objetivos fijados y crear los entregables requeridos, cuyo desarrollo temprano implica mayor precisión en la planificación de costes, plazos, recursos y riesgos. La partida de obra, como elemento unitario de división, fruto de la integración de los conceptos paquete de trabajo y cuenta de coste, vincula las principales restricciones del proyecto, al permitir una correcta estimación, programación y control. La falta de definición del proyecto, reflejada en la omisión de partidas, es una de las principales fuentes de fracaso, conduciendo a sobrecostes, retrasos y/o pérdidas de calidad. Gracias a la participación de técnicos y profesionales de la dirección de proyectos en el sector de la construcción, y mediante ecuaciones estructurales, se investiga y concluye la criticidad e influencia de la EDT para lograr los objetivos propuestos.es_ES
dc.description.abstractIn the construction industry, this research tries to expose the advantages of using the structural system of decomposition of the cost, as a basis for the realization of the work breakdown structure -WBS-, given the achieved advances in standardization, harmonization and unification by cost classification systems. The WBS defines exhaustively and organizes hierarchically the project scope, representing all the specified work to achieve the set objectives and create the required deliverables, whose early development involves more accurate cost, time, resource and risk planning. The item of work, as a unitary element of division, result of the integration of the work package and cost account concepts, links main constraints of the project, allowing a correct estimation, scheduling and control. The lack of definition in the project, reflected in the omission of items, is one of the main sources of failure, leading to overruns, delays and/or quality losses. Thanks to the participation of technicians and project managers in the construction sector, and through structural equations, the criticality and influence of WBS is investigated and concluded to achieve the proposed objectives.es_ES
dc.language.isoeses_ES
dc.subjectIngeniería Civil, Urbanismo y Ordenación del Territorio. Construcción y Arquitecturaes_ES
dc.titleINTEGRACIÓN DE LAS ESTRUCTURAS DE DESGLOSE DEL COSTE Y TRABAJO EN EL SECTOR DE LA CONSTRUCCIÓNes_ES
dc.title.alternativeINTEGRATION OF COST AND WORK BREAKDOWN STRUCTURES IN THE CONSTRUCTION INDUSTRYes_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2017 (Cádiz) [180]
    XXI Congreso Internacional de Dirección e Ingeniería de Proyectos (Cádiz, 2017)

Mostrar el registro sencillo del ítem