Mostrar el registro sencillo del ítem

dc.contributor.authorArango Gil, Francisco Antonio
dc.contributor.authorIglesias-Rey, Pedro L.
dc.contributor.authorMartínez-Solano, F. Javier
dc.contributor.authorLozano Cortes, Jessica Vanessa
dc.contributor.authorMora-Meliá, Daniel
dc.date.accessioned2018-10-31T17:58:26Z
dc.date.available2018-10-31T17:58:26Z
dc.date.issued2018
dc.identifier.isbn978-84-09-05132-8
dc.identifier.urihttp://dspace.aeipro.com/xmlui/handle/123456789/1728
dc.descriptionLos proyectos clásicos de estaciones de bombeo se realizan tomando como punto de partida el caudal máximo que tiene suministrar y la altura necesaria. En base a estos parámetros se seleccionan las bombas y posteriormente en función del consumo previsto se determina el modo de operación más adecuado. En este trabajo se propone una metodología alternativa en el que el proceso de selección de los grupos de bombeo incluye, antes de seleccionar los equipos, una estimación del coste de explotación basándose en el estudio de diferentes modos de regulación y operación de las bombas. Se realiza así una selección multicriterio en la que se consideran por una parte los costes de inversión (equipos de bombeo, instalaciones hidráulicas, equipamiento eléctrico y de control) y por otra los costes de explotación. Estos costes de explotación consideran las diferentes formas de operar el sistema (bombas de velocidad fija, bombas de velocidad variable o combinación de ambas). El método propuesto se aplica a varias estaciones de bombeo reales de las que se conocen las demandas de agua y los requerimientos de presión. El resultado presenta un diagrama de Pareto en que se ilustran todas las posibles soluciones y todos los potenciales modos de regulación.es_ES
dc.description.abstractClassic projects of pumping stations are made considering as a starting point the maximum flow to be supplied and the necessary pressure head. Based on these parameters, the pumps are selected and, subsequently, depending on the expected demand variation, the most appropriate operation mode is determined. This paper proposes an alternative methodology where the pumping groups selection process includes, before selecting the equipment, an estimate of the operation cost based on the study of different operation modes of the pumps. The method involves a multicriteria selection in which the investment costs (pumping equipment, hydraulic installations, electrical and control equipment) and operating costs are considered. These operating costs consider the different ways of operating the system (fixed speed pumps, variable speed pumps or a combination of both). The proposed method is applied to several actual pumping stations where water demands and pressure requirements are known. The results are presented using a Pareto diagram in which all the possible solutions and all the potential operation modes are illustrated.es_ES
dc.language.isoeses_ES
dc.subjectIngeniería Civil, Urbanismo y Ordenación del Territorio. Construcción y Arquitecturaes_ES
dc.titleMETODOLOGÍA PARA PROYECTOS DE ESTACIONES DE BOMBEO DIRECTO A LA RED CONSIDERANDO LA ESTRATEGIA DE REGULACIÓNes_ES
dc.title.alternativeMETHODOLOGY FOR PROJECTS OF PUMPING STATIONS DIRECTLY CONNECTED TO THE NETWORK CONSIDERING THE OPERATION STRATEGYes_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2018 (Madrid) [183]
    XXII Congreso Internacional de Dirección e Ingeniería de Proyectos (Madrid, 2018)

Mostrar el registro sencillo del ítem