Mostrar el registro sencillo del ítem

dc.contributor.authorBallesteros-Pérez, Pablo
dc.contributor.authorSmith, Stefan Thor
dc.contributor.authorLloyd-Papworth, Josephine Gwen
dc.contributor.authorCooke, Peter
dc.date.accessioned2018-10-17T12:54:04Z
dc.date.available2018-10-17T12:54:04Z
dc.date.issued2018
dc.identifier.isbn978-84-09-05132-8
dc.identifier.urihttp://dspace.aeipro.com/xmlui/handle/123456789/1579
dc.descriptionLos proyectos de construcción habitualmente sufren retrasos e incrementos de coste. Mala planificación y seguimiento, además de una climatología adversa, son dos de las causas más comunes por las que se producen estos retrasos y sobrecostes. Sin embargo, existen muy pocas herramientas prácticas que permitan a directores de proyectos de construcción el tener en cuenta el potencial impacto del mal tiempo en contextos reales. Este artículo describe cómo se desarrollaron unos mapas específicamente orientados al ámbito de la construcción y que son relevantes tanto para las fases de planificación como de ejecución de cualquier proyecto. Estos mapas concentran una amplia cantidad de información histórica de múltiples estaciones meteorológicas del país. En particular, estos mapas representan la proporción media de ‘trabajabilidad’ (probabilidad de poder ejecutar la tarea en cuestión) cuando se ejecutan una serie de actividades que suelen formar parte de una gran mayoría de proyectos de construcción. Entre las aplicaciones de la información de estos mapas se podrán efectuar: optimizaciones de la fecha de comienzo de cualquier proyectos (de tal manera que su coste y duración puedan reducirse); anticipar la distribución probabilística de la duración del proyecto; y gestionar reclamaciones vinculadas con mala climatología de una manera objetiva y justa.es_ES
dc.description.abstractConstruction projects usually suffer from delays and cost overruns. Poor planning and control practices, as well as the impact of (adverse) weather, are two of the most common causes for these delays and cost overruns. However, there are still very few practical tools that allow construction managers to take into account the potential impact of weather in real settings. This paper describes how a series of construction-relevant maps were developed to be used by UK construction managers during the planning and execution stages of any project. These maps synthesize large weather historical information from multiple weather stations across the country. Particularly, these maps represent the average proportion of workable days of a series of common and standard construction activities that belong to most construction projects. Applications of the information contained in these maps allow for: optimising the start date of any project (so that its cost and duration can be reduced), anticipating the likely project duration distribution as a function of the project start date and its location(s); and dealing with weather-related claims in an objective and fair manner.es_ES
dc.language.isoeses_ES
dc.subjectIngeniería Civil, Urbanismo y Ordenación del Territorio. Construcción y Arquitecturaes_ES
dc.titleDESARROLLO DE MAPAS CLIMATOLÓGICOS PARA DIRECTORES DE PROYECTOS DE OBRAS DE CONSTRUCCIÓN: APLICACIÓN EN EL REINO UNIDOes_ES
dc.title.alternativeDEVELOPING CONSTRUCTION-RELEVANT WEATHER MAPS FOR PROJECT MANAGERS: APPLICATION TO THE UKes_ES
dc.typeArticlees_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • CIDIP 2018 (Madrid) [183]
    XXII Congreso Internacional de Dirección e Ingeniería de Proyectos (Madrid, 2018)

Mostrar el registro sencillo del ítem