• Login
    Search 
    •   AEIPRO
    • Proceedings from the International Congress on Project Management and Engineering
    • Search
    •   AEIPRO
    • Proceedings from the International Congress on Project Management and Engineering
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-9 of 9

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    Aplicación de las metodologías de Dirección de Proyectos a proyectos de I+D+i colaborativo: Dirección del proyecto PORTOS 

    Fouz Varela, David Mateo; Carballo Sánchez, Rodrigo; López Moreira, Iván; Díaz Varela, Emilio Rafael (2020)
    A correct use of Project Management methodologies has a key role in the case of public calls for collaborative R&D projects, as those financed with European Regional Development Funds (ERDF), given by either their strict ...
    Thumbnail

    Evaluación del valor de adquisición del equipamiento electromédico en relación con la infraestructura, uso asistencial y consumo energético en hospitales 

    Aunión-Villa, Juan; González-Domínguez, Jaime; Sánchez-Barroso, Gonzalo; García-Sanz-Calcedo, Justo; López-Rodríguez, Fernando (2020)
    The functionality of hospitals nowadays depends largely on the electromedical equipment they have, not only for the number of equipment but for its economic value. The total adquisition cost of the electromedical equipment ...
    Thumbnail

    Las mejores prácticas de gestión de residuos de construcción y demolición en Europa: análisis comparativo. Herramientas digitales. 

    Kusheva, Ralitsa; Petrova, Rossitza (2020)
    Construction and demolition waste forms a significant percentage of all the waste streams generated in Europe. The European Commission has set targets and goals for this waste stream, implying the executions of circular ...
    Thumbnail

    Desafíos en la implementación de FIDIC debido a discrepancias entre los términos contractuales y la legislación local. Análisis comparativo. 

    Valkova, Ana-María; Milachkova, Mariela (2020)
    The purpose of a contract is to set out the rights, responsibilities and liabilities, of the parties and can be described as a “means toallocate risk between parties”. The main differences between the Spatial Development ...
    Thumbnail

    Características de las políticas industriales en regiones europeas y su relación con la innovación 

    Artigas Barceló, Sergio; García Carrillo, Águeda (2020)
    The analysis of the industrial policy of a region shows the diversity and dispersion of these between the different regions of the European Union. The objective of this work is to identify those characteristics of the ...
    Thumbnail

    Comparativa de sistemas regionales de innovación según los indicadores del Regional Innovation Scoreboard 

    Artigas Barceló, Sergio; García Carrillo, Águeda (2020)
    As industries and companies can base their competitiveness on innovation, at the territorial level the regions show a positioning that characterizes them as more or less innovative. The Regional Innovation Scoreboard is a ...
    Thumbnail

    La figura del PM en la edificación: promoción y desarrollo profesional desde la Associació Catalana de Project Management 

    Alonso Argul, María Teresa; Seguró Capa, Jordi (2020)
    In the current international context, project management has become a complex multidisciplinary and multisectoral profession. The figure of the PM in building industries is something increasingly common and valued by ...
    Thumbnail

    Buenas prácticas para la resolución de conflictos en la gestión de la construcción. 

    Villena Manzanares, Marcelo; Villena Manzanares, Francisco (2020)
    Management in the construction industry from the point of view of the contractor, is in the hands of the construction manager. The work team for the execution of the works is subject to the time and cost factor, and in ...
    Thumbnail

    STUDY OF THE PRODUCTION SYSTEM OF RED AND WHITE WINE AND PROPOSALS FOR IMPROVEMENT IN A WINE COMPANY 

    Martínez Montero, María; García Fayos, Beatriz; Arnal Arnal, José Miguel; Sancho Fernández, María (AEIPRO, 2020-07)
    A wine company in the province of Albacete has a daily production of between 500000 and 1.5 million kg of grape. The increase of the raw material in the last campaigns has caused an imbalance between the production speed ...

    DSpace software copyright © 2002-2016  AEIPRO
    Contact Us | Send Feedback
     

     

    Browse

    All of AEIPROCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CommunityBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Discover

    AuthorArtigas Barceló, Sergio (2)García Carrillo, Águeda (2)Alonso Argul, María Teresa (1)Arnal Arnal, José Miguel (1)Aunión-Villa, Juan (1)Carballo Sánchez, Rodrigo (1)Díaz Varela, Emilio Rafael (1)Fouz Varela, David Mateo (1)García Fayos, Beatriz (1)García-Sanz-Calcedo, Justo (1)... View MoreSubject
    10-Buenas prácticas y casos de empresa (9)
    ... View MoreDate Issued
    2020 (9)
    Has File(s)Yes (9)

    DSpace software copyright © 2002-2016  AEIPRO
    Contact Us | Send Feedback