• Login
    Search 
    •   AEIPRO
    • Search
    •   AEIPRO
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 11-20 of 83

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    LIMITACIONES Y MEJORAS DE LA METODOLOGÍA DEL VALOR GANADO EN LA GESTIÓN INTEGRADA DEL PLAZO Y COSTE DE PROYECTOS 

    Pajares, J.; López, A. (2008)
    Earned Value Management (EVM) is a simple and elegant methodology for integrated management of project time and cost. EVM gives measures about the performance of the project, so that early correction actions could take ...
    Thumbnail

    SELECCIÓN DE PROYECTOS DE ENERGÍA SOLAR FOTOVOLTAICA MEDIANTE PROCESO ANALÍTICO EN RED (ANP) 

    Aragonés, P.; Chaparro, F.; Pastor, J.P.; Rodríguez, F. (2008)
    In this communication an application of the Analytic Network Process (ANP) to select photovoltaic solar energy projects is presented. These types of projects have a long procedure from the selection of the location to start ...
    Thumbnail

    LA INTEGRACIÓN DE LA CREACIÓN Y LA GESTIÓN EN LOS PROYECTOS DE ARTE DRAMÁTICO 

    Rojo, M.S.(P); Alvarado, L. (2008)
    In the development art dramatic’ projects interaction in oneself process creators (Actors, directors, designers and other) and agents (producers). The spirit and the professional profile of one and another are notably ...
    Thumbnail

    ESTANDARIZACIÓN EN LA DIRECCIÓN DE PROYECTOS 

    Marcelo, J.; Fernández, M.; Montesa, J.O.; Sanz, M.D.; Sanz, I.; Torralba, J.M. (2008)
    We made a proposal to improve the standard IS 21500 currently under development, in line with input from PMBoK'2008, especially to increase the cohesion and structure. Keywords: Standardization, Project Management
    Thumbnail

    EL INGENIERO CONSULTOR COMO MEDIADOR EN LOS MERCADOS PÚBLICOS DE INFRAESTRUCTURAS 

    Gómez Frías, V.(p); Sánchez Chaparro, T. (2008)
    We present a research about the consulting engineer as an economic mediator in public infrastructures markets, which leads to detect new activities’ opportunities. In parallel, we develop the management strategies needed ...
    Thumbnail

    SITUACIÓN DE LA SEGURIDAD EN LA CONSTRUCCIÓN EN LA REPÚBLICA DOMINICANA 

    Cano, J.L; Neris, K. (p) (2008)
    Globally the construction sector is among those who reported the highest number of accidents at work. This article provides an overview of the state of occupational safety in construction in the Dominican Republic, starting ...
    Thumbnail

    LOS COSTES DE LA CALIDAD COMO HERRAMIENTA DE GESTIÓN EN EMPRESAS CONSTRUCTORAS 

    Dzul, L.A.; Gracia, S. (2008)
    The quality costs are a quality management tool to measure the continual improvement. The objective of a quality costs system is to find the level of quality that minimizes total quality costs; this will give the security ...
    Thumbnail

    LA DIRECCIÓN DE PROYECTOS EN LA EMPRESA EXTENDIDA 

    Ruiz, L.; Caamaño, J. (2008)
    An extended enterprise could be both an enterprise based in a combination of different sites, even located at different continents, or resulting from co-operation of groups of working teams coming from different enterprises. ...
    Thumbnail

    LA GESTIÓN DE LA I+D+I EN LAS UNIVERSIDADES ESPAÑOLAS 

    Varas, M; Caamaño, J. (2008)
    The new role that universities possess in the innovation, was promoted from an evolution both of own universities and of the social frame in one that is inserted This way, university research turns into one of the props ...
    Thumbnail

    MODELO DE CRITICIDAD OPERACIONAL EN GENERADORES DE PARQUES EOLICOS 

    González, J.M.(P); Amendola, L.; Depool, T. (2008)
    What set of elements does the attention of enterprise’s resources require? What priority do the activities have within the process of asset management? They are usually some of the questions formulated, and their answers ...
    • 1
    • 2
    • 3
    • 4
    • 5
    • . . .
    • 9

    DSpace software copyright © 2002-2016  AEIPRO
    Contact Us | Send Feedback
     

     

    Browse

    All of AEIPROCommunities & CollectionsBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Discover

    AuthorCaamaño, J. (4)Rodríguez, F. (4)Alvarado, L. (3)Depool, T. (3)García, M. (3)Pastor, J.P. (3)Alcaide-Marzal, Jorge (2)Amendola, L.(P) (2)Amendola. L., Depool. T., González. J.M. (2)Asensio-Cuesta, Sabina (2)... View MoreSubject
    Dirección y Gestión de Proyectos (83)
    ... View MoreDate Issued2008 (43)2009 (40)Has File(s)Yes (83)

    DSpace software copyright © 2002-2016  AEIPRO
    Contact Us | Send Feedback